Water and Sanitation on appointment of an acting accounting authority at Umgeni Water
It is widely known by now that the KwaZulu-Natal High Court, Pietermaritzburg, has reviewed and set aside the decision of the former Minister of Human
It is widely known by now that the KwaZulu-Natal High Court, Pietermaritzburg, has reviewed and set aside the decision of the former Minister of Human
Regretfully, Stage 2 loadshedding will be implemented from 16:00 until 05:00 tomorrow as power constraints persist Tuesday, 02 November 2021: Eskom regrets that due to
The City’s Water and Sanitation Department has previously had to postpone the scheduling of the shutdown of the 1 220mm diameter Tygerberg water pipeline between
The African National Congress (ANC) has emerged as early frontrunner in the wake of Monday’s 2021 Local Government Elections, with results confirming the party had
Eskom has announced that stage two load shedding will be implemented from 4pm this afternoon following a shortage of generating capacity. On Tuesday morning,
Power utility Eskom has assured the public that its power systems are not on the brink of collapse. This as the utility implemented stage four
The Integrated Vaal River System’s (IVRS) levels have shown stability in the past few weeks, despite recording a minor fall this week. Week-on-week, the
Copyright © 2024 South Africa News Gazette. All Rights Reserved.