Routine electricity maintenance for 14 March – 20 March 2022
The City of Cape Town thanks customers for their patience as we do necessary routine maintenance on our electrical infrastructure next week in various areas
The City of Cape Town thanks customers for their patience as we do necessary routine maintenance on our electrical infrastructure next week in various areas
Load shedding is expected to be eased from stage 4 to stage 3 at 9pm this evening after power utility, Eskom, recovered some generating capacity
ESKOM Stage 4 load shedding devastating for Western Cape economy; Emergency services at the ready. Responding to the latest announcement by Eskom that it will
Due to further failures of generation units, power utility Eskom has escalated load shedding from Stage 2 to Stage 4 on Thursday. The power utility
Eskom Chief Operations Officer Jan Oberholzer says Stage 4 load shedding will give the power utility enough space to build up fast-depleting emergency reserves and
DWS Western Cape media briefing Today, 8 March our Department of Water and Sanitation (DWS) in the Western Cape is briefing the media on several
The City’s Water and Sanitation Department will be conducting urgent repairs on the 225mm diameter main water supply to the Vredehoek, Tamboerskloof and Bo-Kaap areas.
Copyright © 2024 South Africa News Gazette. All Rights Reserved.